The audit obligation is here. The gains are yours to capture.
Meet the audit obligation and use the outcome to save energy and free up room on your grid connection.
Subject to the audit obligation? Then get energy savings out of it too.
The EED (Energy Efficiency Directive) is the European directive on energy efficiency. For companies it means one thing: a mandatory energy audit every four years. More on the audit obligation at RVO →
The basis is shifting from company size to energy consumption. From 10 TJ per year you are subject to the audit obligation, often for the first time.
We check whether you fall under the obligation and deliver an audit that is RVO-proof.
If you only tick the box, the audit sits unused in a drawer for those four years.
We translate the mandatory measures into concrete savings on your energy bill.
The audit covers at least 90% of your consumption, across all energy carriers. That takes time and capacity.
We do the analysis and find immediate room on your grid connection. You provide the data and the signature.
If you fail to comply, the competent authority enforces (municipality, environmental agency or RVO). That starts with a warning and can escalate into an order subject to penalty payments.
Source · EED (Directive 2023/1791) · EN 16247 · RVO · Kader knowledge session Oct 2025
Your first audit must be in place by the end of 2027.
What it delivers, you decide now.
Three phases, from obligation to savings.
A complete picture of your energy
Your consumption mapped by energy carrier, process and asset, with at least 90% coverage.
A complete energy balance.
Quantified by what it delivers
Recognised and additional measures calculated for savings and payback period, together with your technical team.
A weighted list of measures.
Compliance plus a concrete next step
Everything to EN 16247 in an RVO-proof report, plus an action plan.
The mandatory audit plus a concrete follow-up.
A large part of the EED audit overlaps with a flex analysis. That makes the audit a strong starting point in itself: you meet the obligation and lay the groundwork for more room on your grid connection. If you want to go further, the FlexScan or an ongoing Energy partnership follows on seamlessly. The Flex-e subsidy can run in parallel: FlexEdge prepares the application and submits it to RVO.
