Growing on a congested grid

Progress despite grid congestion.

FlexEdge provides independent energy advice for companies that are stuck on the grid, or can see it coming. We free up the flexibility that is already there: we map your energy situation, calculate the measures and help you carry them out.

The situation

The grid is full, and it affects your business.

Waiting for a connection isn't standing still. It's falling behind.

Waiting list for a connection
15,000companies
More than 15,000 companies are waiting for a new or heavier connection. As of 2026, and the queue is still growing: since 1 July 2026 smaller companies are joining too.
Waiting for a heavier connection
5–10years
That is how long it takes to reinforce a connection in areas where the grid is full. Your planned expansion cannot wait that long.
Grid tariffs are rising
1.7–2.3× higher
By 2040 grid tariffs are expected to be 1.7 to 2.3 times higher than in 2026. From 2028 you are expected to pay more at the times the grid is busiest.
Source · Netbeheer Nederland (queue as of 2026) · FIEN26, PwC Strategy& for Netbeheer Nederland (March 2026) · code amendment proposal on time-of-use transport tariffs for large users, ACM decision expected end of 2026
What that means for your business
01 · Security of supply

Continuity under pressure. More and more companies are running into the limits of their connection. At critical locations, the grid is temporarily scaled back during peak moments as a precaution.

02 · Competitiveness

Growth that stalls. Anyone looking to expand, electrify or open a new site cannot get a connection for the time being. Companies that do make room on their connection build a lead.

03 · Energy costs

Rising costs. Grid tariffs are becoming time-dependent: busy hours more expensive, off-peak cheaper. Those who do not spread their consumption pay twice: higher tariffs and a higher charge for their largest peak.

Our approach

With the Flex Roadmap you move forward in three phases. After each phase, you decide whether to continue.

You can wait five to ten years in the queue for a heavier connection, or make the most of the room you already have. That room is often in your own process: peaks that do not have to coincide, equipment that can run an hour later, capacity that is contracted on paper but rarely used. We help you free it up.

Start with the FlexScan and know within two weeks where you stand. If more is needed, the Flex Deep Dive delivers a detailed analysis that results in your Energy Plan: you then know what has to happen over the coming years, and when. As Energy partner we support you in carrying it out.

Phase 01
FlexScan
Where do I stand?
Your energy situation per connection, the opportunities and risks, and 3 to 5 concrete actions. If nothing is needed, we will say so.
Price€5,000, €2,500 net after Flex-e (temporarily closed)Duration2 weeksFor whomany connection size, subsidy from a large-business connection (3×80A)
More about the FlexScan →
Phase 02
Flex Deep Dive
What exactly should I do?
Your energy system examined in detail, leading to a fully worked-out Energy Plan: a multi-year plan with a business case per measure.
Price€15,000, €7,500 net after Flex-e (temporarily closed)Duration4 to 8 weeksFor whomfrom 100 kW
More about the Flex Deep Dive →
Phase 03
Energy partner
Execute it and stay on course.
We help you steer the Energy Plan and deliver the measures. We align with suppliers, grid operators and funding bodies, keep the plan current, and set priorities with you every month.
Priceindicative €2,000-€6,000 per monthDurationongoing, cancellableFor whomafter a FlexScan, Deep Dive or energy audit
More about the Energy partnership →

We make use of the Dutch Flex-e scheme: around 50% of the cost is reimbursed. We handle the application. The scheme is temporarily closed. We expect it to reopen in spring 2027. More about Flex-e at RVO →

Why FlexEdge

Years of experience in the energy world.

Two founders with a technical background in energy systems, years of experience in strategic advice, and experience on the grid operator's side.

01
Independent

We sell no products and earn nothing on the measures you choose. Our only interest is that you end up with the energy system that works best for you.

02
Technical depth

We look beyond the battery and start with your own process. With our technical knowledge we unlock the flexibility already sitting there; only then do we look at new installations. That produces more result per euro invested.

03
We get things done

Change is people's work. Our analyses add up technically and match what operators on the floor actually see, and our strategic angle makes sure the decision is backed at board level. From boiler to boardroom, so something really changes.

The people behind FlexEdge
Mick Richards
Mick Richards
Co-founder
Joris Miedema
Joris Miedema
Co-founder

Curious what the end result looks like?

We are happy to show you an anonymised example report in a free advisory call. You will see straight away what would land on the table for your own situation.